![]() 9 Requirements for Access to Scaffolds Ladders and Rest Platforms. ![]() Mapping safety and environmental management policies, procedures, or operations using this document does not guarantee compliance regulatory requirements.ĥ Contents Course Introduction. Each employer s safety management system will be different. Ultimately every company is responsible for determining the applicability of the information in this document to its own operations. Taking actions suggested in this document does not guarantee that an employer, employee, operator or contractor will be in compliance with applicable regulations. GEIGLE SAFETY GROUP, INC., DISCLAIMS ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING, WITHOUT LIMITATION, ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Neither Geigle Safety Group, Inc., nor any of its employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, or assume any liability or responsibility for any use, or the results of such use, of any information or process disclosed in this publication. Consult with your own company counsel for advice on compliance with all applicable state and federal regulations. We hope you enjoy the course and if you have any questions, feel free to or call: OSHAcademy NW Greenbrier Parkway, Suite 230 Beaverton, Oregon Disclaimer This document does not constitute legal advice. The final exam will consist of questions developed from the course content and module quizzes. You can print the post-quiz response screen which will contain the correct answers to the questions. Read each module, answer the quiz questions, and submit the quiz questions online through the course webpage. This study guide is designed to be reviewed off-line as a tool for preparation to successfully complete OSHAcademy Course 804. Contact OSHAcademy to arrange for use as a training document. Any commercial use of this document is strictly forbidden. No portion of this text may be reprinted for other than personal use. Wren T, Fawcett JN, Burdess JS (1989) Application of extensible catenary theory to determine the displacement of a moored ship.3 OSHAcademy Course 804 Study Guide Safe Scaffold Erection and Inspection Copyright 2016 Geigle Safety Group, Inc. In: Proceedings of the ASME 2012 31st international conference on Ocean, Offshore and Arctic Engineering, Rio de Janeiro Webster WC, Lambrakos K, Kim J, Jing X (2012) Rod dynamics with large stretch. Vryhof anchors b.v., krimpen a/d yssel, the Netherlands, 2005 Smith RJ, Macfarlane CJ (2001) Statics of a three component mooring line. Skop RA (1988) Mooring systems: a state-of-the-art review. Samad FIA (2009) Performance of catenary mooring system. International Society of Offshore and Polar Engineers, Stavanger, p 7 In: The eleventh international offshore and polar engineering conference. Ruinen R, Degenkamp G (2001) Anchor selection and installation for shallow and deepwater mooring systems. Ma G, Sun LP, Shang-Mao AI et al (2015) A nonlinear mechanical model for extensible slender rods. A program for two-dimensional dynamic analysis of forces on mooring line by use of lumped mass method (an outline of programs compiled in Ship Research Institute-No. API Publishing Services, Washington, DCīanfield SJ, Flory JF (2009) Improved mooring line technology for tankers and gas carriers at exposed berths, OCEANS 2009 MTS/IEEE, Biloxi, Mississippi, USA. American Petroleum Institute (API) (2005) Design and analysis of station keeping systems for floating structures.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |